|
|
|
|
| |
| Master Planning |
|
Stahlman Group's Master Planning Group evaluates the most effective use of facilities and develops business engineering solutions that address the needs of the operation for the future. The master plan will evaluate all aspects of the operation to support expansion, consolidation or optimization opportunities.
The components of the planning process which Stahlman Group evaluates include:
- Warehouse Analysis
- Site Analysis and Selection
- Logistic Studies
- Facility Acquisition Analysis
- Trucking Analysis
- Utility Analysis
- Energy Studies
- Systems Expansion
- Building Expansion
- Materials Handling Systems
- Distribution Studies
- Feasibility Studies
|
|
As part of the planning process, Stahlman Group provides the expertise in developing the conceptual layouts which include:
|
| |
|
 |
|
Houston Distributing Company, Inc., Houston, TX
- Master plan and materials handling study to install a new automatic case picking system and 16,000 sq ft warehouse expansion. For this pioneering state-of-the-art project we coordinated with Jayson Concepts, Inc. The warehouse expansion and modification portion included significant changes to the warehouse size and layout, a cooler addition and implementation of an automated case handling system. Other projects included preliminary, final design and construction management for a 40,000 sq ft truck load lane and warehouse addition.
| |
|
| |
|
|
|
|
|